Design closure

Results: 169



#Item
31Datasheet  IC Compiler II The Leader in Place and Route - Now With the Power of 10X  ``

Datasheet IC Compiler II The Leader in Place and Route - Now With the Power of 10X ``

Add to Reading List

Source URL: www.synopsys.com

Language: English - Date: 2015-02-18 15:15:28
32Media Release 22 MarchFor Immediate Use The Channel – better by design Design work will commence this week on the partial closure of the constructed southern entrance into Swan Bay in Lake Macquarie following t

Media Release 22 MarchFor Immediate Use The Channel – better by design Design work will commence this week on the partial closure of the constructed southern entrance into Swan Bay in Lake Macquarie following t

Add to Reading List

Source URL: www.livinglakemacquarie.org

Language: English - Date: 2011-08-14 18:50:28
    33A Lean Fabless Semiconductor Business Model Andreas Olofsson, Adapteva, Inc. There is currently a general consensus among industry analysts, investors and company executives that leading-edge digital chip development pro

    A Lean Fabless Semiconductor Business Model Andreas Olofsson, Adapteva, Inc. There is currently a general consensus among industry analysts, investors and company executives that leading-edge digital chip development pro

    Add to Reading List

    Source URL: www.gsaglobal.org

    Language: English - Date: 2014-01-22 10:50:17
    34Concurrent, OA-based Mixed-signal Implementation Mladen Nizic Eng. Director, Mixed-signal Solution  © 2011, Cadence Design Systems, Inc. All rights reserved worldwide.

    Concurrent, OA-based Mixed-signal Implementation Mladen Nizic Eng. Director, Mixed-signal Solution © 2011, Cadence Design Systems, Inc. All rights reserved worldwide.

    Add to Reading List

    Source URL: www.gsaglobal.org

    Language: English - Date: 2014-01-22 10:43:11
    35Baltic-Adriatic Core Network Corridor: Design study and Environmental Impact Assessment (EIA) to implement the gap-closure along the Pottendorfer Line (Vienna–Wiener Neustadt) between Münchendorf and Wampersdorf (via

    Baltic-Adriatic Core Network Corridor: Design study and Environmental Impact Assessment (EIA) to implement the gap-closure along the Pottendorfer Line (Vienna–Wiener Neustadt) between Münchendorf and Wampersdorf (via

    Add to Reading List

    Source URL: inea.ec.europa.eu

    Language: English - Date: 2014-11-13 06:33:08
    36Achieving Complexity and Reliability on Unreliable Platforms Pauline C. Haddow and Morten Hartmann The Norwegian University of Science and Technology Department of Computer and Information Science Sem Sælands vei 7-9, 7

    Achieving Complexity and Reliability on Unreliable Platforms Pauline C. Haddow and Morten Hartmann The Norwegian University of Science and Technology Department of Computer and Information Science Sem Sælands vei 7-9, 7

    Add to Reading List

    Source URL: www.nik.no

    Language: English - Date: 2002-10-17 07:54:31
    37Visio-IRB Submission Process Protocol Closure.vsd

    Visio-IRB Submission Process Protocol Closure.vsd

    Add to Reading List

    Source URL: www.nps.edu

    Language: English - Date: 2013-03-14 14:53:15
    38Customer Notice LLWR-CN[removed]TC03 Package Update  Introduction

    Customer Notice LLWR-CN[removed]TC03 Package Update Introduction

    Add to Reading List

    Source URL: llwrsite.com

    Language: English - Date: 2015-03-02 06:06:43
    39Advanced encoding of programs CS294: Program Synthesis for Everyone Ras Bodik Emina Torlak  Division of Computer Science

    Advanced encoding of programs CS294: Program Synthesis for Everyone Ras Bodik Emina Torlak Division of Computer Science

    Add to Reading List

    Source URL: www.cs.berkeley.edu

    Language: English - Date: 2012-09-09 10:02:45
    40MULTI DISCIPLINARY OPTIMIZATION OF RAILWAYS SYSTEMS E. Di Pasquale1, G. Gielczynski2 Abstract After an analysis of the design process of railway structures, we set up a formulation for the multi-disciplinary optimization

    MULTI DISCIPLINARY OPTIMIZATION OF RAILWAYS SYSTEMS E. Di Pasquale1, G. Gielczynski2 Abstract After an analysis of the design process of railway structures, we set up a formulation for the multi-disciplinary optimization

    Add to Reading List

    Source URL: www.simtech.fr

    Language: English - Date: 2012-09-25 11:14:56